Building construction isn’t a simple task. From the
project's inception to its completion, it involves numerous steps
and opinions. Working on a real site is very different from paper
plans. Projects fail when early decisions are rushed. They succeed
when the basics are handled properly.
This stage decides whether your project will be smooth or painful.
Rushing here almost always incurs additional costs later. These
things matter more than people think.
Land and paperwork
You’d be surprised how many projects pause mid-way because of land
issues. You must ensure this paperwork:
Confirm ownership documents and updated land records
Verify land use and zoning regulations
Mutation records
Check road access and boundary demarcation
Legal issues discovered mid-construction can stop work completely.
Soil test
A soil test is mandatory in Bangladesh. The soil is different in
every part of the country. In some areas, piling is unavoidable. In
others, shallow foundations work just fine. So you must ensure the
condition of the soil. Soil test gives an idea about the foundation
type and piling depth.
Budget planning and cost estimation
Most budgets look fine on paper. Until construction starts. Here’s
what usually gets missed:
Approval fees
Utility connections
Design revisions
Small changes that add up fast
Professional cost estimation helps you avoid surprises halfway
through the project.
Design and engineering preparation
Sometimes, more for commercial projects. Also, don’t chase the
lowest estimate. That almost always comes back as an extra cost
later. People focus on layouts. Design is also about load paths,
ventilation, stair positioning, and future expansion. Things you
won’t notice on day one, but you will five years later.
Authority approvals and permissions
Construction without approval is a risk you don’t want. In dense
city plots, staircase and lift placement can make or break usable
space.
RAJUK, city corporations, and fire service approvals take time to get.
So you have to wait for those approvals. Skipping approvals is a
worse decision.
Contractor and construction partner selection checklist
Construction management
is challenging work. Choosing the right construction partner matters more than
selecting materials. A cheap construction work with no engineering
support will look attractive. Until problems start.
Select the right construction company
Construction is coordination. Without management, even good
labor fails. You must ensure:
Engineers on payroll
Clear scope of work
Written material specifications
Site supervision, not just labor supply
Scope of work and agreement clarity
Everything must be written clearly. A vague agreement
creates disputes later. You must ensure:
Detailed BOQ with specifications
Material brands and quality standards
Defined timelines and milestones
Construction phase checklist
This is where planning turns into reality. This is the most critical
phase where you need to execute the plan. One small mistake here
travels upward.
Site setup and layout
Before concrete, everything must line up. Grid markings. Levels.
Reference points.
Foundation and piling
Follow the soil report. Piles need testing. Reinforcement needs
checking. Curing needs time. Rushing foundation work always shows
later.
RCC structure
We insist on checking reinforcement before every casting. Concrete
grade matters. Water-cement ratio matters. Curing matters. This is
not the stage to compromise.
MEP and utility checklist
Electrical and plumbing mistakes are painful because fixing them
means breaking things.
Electrical planning should consider future load. Air
conditioners. Elevators. Generators.
Plumbing needs a slope. Proper drainage. Pressure testing
before walls close.
Fire safety is non-negotiable for commercial buildings.
Exits, stair widths, firefighting systems. All must align with
authority requirements.
Finishing works checklist
This is where clients get excited. Uneven plaster shows through the
paint. Bad tile alignment never un-sees itself. Before the handover,
you must ensure a general check:
Inspect everything.
Test electrical loads.
Check plumbing pressure.
Ask for as-built drawings.
Warranty documents.
Why an expert-led checklist matters
Managing construction without professional guidance often leads to
hidden costs, delays, and compromised quality. An expert-led
checklist ensures that every stage is technically sound and
well-coordinated.
Conspert Limited provides end-to-end construction
solutions,
including soil testing, RCC structure, architectural and
structural design, project management, and turnkey construction with full handover. This integrated
approach minimizes risk and delivers predictable outcomes.
Final thoughts
Construction succeeds when decisions are made in the right order. A
proper checklist doesn’t slow you down; it protects your investment.
If you’re planning to build in Bangladesh, whether
residential or commercial, expert guidance makes all
the difference.
While not always legally enforced, soil testing is essential
for safe and economical foundation design.
Residential projects typically take 12–18 months, depending
on size, approvals, and complexity.
Design, construction, supervision, finishing, and handover
under one contract.
Keeping 8–12 percent of the total budget is generally
recommended.
Starting without approval is risky and can result in fines
or work stoppage.
Cement, steel, finishing materials, and MEP components have
the biggest impact.
Best Building Constructor
Explore top-tier construction management solutions tailored to
your needs—expert oversight, innovative strategies, and reliable
project delivery from start to finish.